This lander will carry all the equipment to the Moon to start building the Moon Base. And it launches as early as this fallβ¦ Meet the Blue Moon Mark 1 Endurance, Blue Origin's lunar lander, selected by NASA as the very first mission of the Moon Base program. π Here's what it's carrying on its first tripβ¦ π₯ Stereo Cameras β to study how rocket thrusters interact with the Moon's surface during landing. π¦ Laser Retroreflective Array helps orbiting spacecraft pinpoint their exact location above the Moon And its destination? The Shackleton Connecting Ridge is a key location near the lunar South Pole where NASA plans to build a permanent human outpost. This mission isn't just a delivery runβ¦ Every piece of data it collects will help prepare for astronaut landings in 2028. π¨βπ NASA awarded Blue Origin $188 million for this mission β with an option for $280 million more based on performance. The Moon Base era doesn't start in the future. It starts this fall. π Are you ready to watch history happen? π πΈ Credit: Blue Origin / NASA





